Boning Room Switchboard and Controls Upgrade

Staged over 2 shutdowns, CAS were commissioned to provide a full set of engineering design to implement the following:

  • Upgrade 3 x 1600 Amp high powered MSB’s to 61439 Standard

  • Remove all Devicenet Devices and integrate ethernet as a replacement (approximately 200 Devices)

  • Undertake a safety assessment of the existing system and undertake and implement CAT3 Safety roll out across

  • all equipment

  • Upgrade all Major PLC’s to Safety PLC’s

  • Develop and Commission all PLC/SCADA across all Devices

  • All electrical installations and commissioning within the strict timelines with limited outages

Man Hours: 3,000 hrs

Lost time:  0 hrs