Carton Conveyor System

Scope of works:

  • Design and Build an MCC to control all 32 VSD controlled motors, sensors and Estops

  • Conduct a full F.A.T of the system for client approval

  • All pre works undertaken to allow a fast and smooth installation

  • Decommissioning the existing conveyors system to allow the new equipment to be installed

  • Electrical connection of the new equipment, interlocking with up and down stream systems

  • Commissioning and startup support

  • Operator training and support

Man hours: 1,800 hours 

Lost time: 0